Pumping tests on the Willy-Brandt-Ring provide important findings

Pumping tests on the Willy-Brandt-Ring provide important findings

Pumping tests on the Willy-Brandt-Ring provide important findings GRILLO uses pumping tests to check how permeable the soil is for the construction of a well in order to prevent contaminated groundwater from leaving the factory premises. In April 2025, pumping tests...
Information on groundwater at our plant site in Duisburg-Marxloh

Information on groundwater at our plant site in Duisburg-Marxloh

Information on groundwater at our plant site in Duisburg-Marxloh GRILLO is planning extensive measures to clean the groundwater around the Duisburg site. Duisburg, May 2025 – Investigations at our company premises in Duisburg-Marxloh have revealed elevated...
GRILLO starts test drilling

GRILLO starts test drilling

GRILLO starts test drilling Test drillings at Willy-Brandt-Ring should provide information about the soil structure. In collaboration with an external drilling institute, GRILLO-Werke has begun test drilling at Willy-Brandt-Ring. The aim of these geological...
Two-day B@TIS status seminar on battery research

Two-day B@TIS status seminar on battery research

Two-day B@TIS status seminar on battery research Exciting insights into battery research: Our colleagues were part of the status seminar of the BMBF funding measure B@TS and exchanged ideas with other stakeholders on site. Our colleagues Christoph Müller and Petra...
GRILLO Chemicals GmbH: Return to regular operations

GRILLO Chemicals GmbH: Return to regular operations

Return to regular operations at GRILLO Chemicals GmbH GRILLO Chemicals GmbH will resume regular operations from 15.04.2025. A force majeure event therefore no longer exists. Duisburg, 15.04.2025: GRILLO Chemicals GmbH returns to the letter of March 31, 2025, in which...